RTC #00-081

March 7, 2000

 

SUBJECT: Trinet Essential Facilities (Kenneth Rodriques & Partners): Application for a Use Permit to allow demolition of an existing building, a remodeling of an existing building and construction of a 3-story office building with a Floor Area Ratio of 51% where 35% is allowed without a Use Permit. The property is located at 1260 Crossman Avenue in an M-3 (General Industrial) Zoning District. (APN: 110-36-020)(Mitigated Negative Declaration)

Motion 1999-1197- Use Permit to allow the remodel of an existing building and construction of a 3-story office building with a site Floor Area Ratio of 51%.

REPORT IN BRIEF

Existing Site Conditions

One building vacant

One existing office/research and development building

Surrounding Land Uses

North

Industrial

South

Industrial (Hotel)

East

Industrial (across Java Drive)

West

Industrial

Issues

Intensification of Use

Architecture

Environmental Status

A Mitigated Negative Declaration has been prepared in compliance with California Environmental Quality Act provisions, as amended, in Resolution #193-86.

Staff Recommendation

Approve with conditions

Planning Commission Recommendation

Approve with conditions

MAP

PROJECT DATA TABLE

 


Existing


Proposed

Required/ Permitted

General Plan Category

Industrial

Same

--

Zoning District

M-S

M-S

--

Type of Project

Two office buildings

Demolish one building; Remodel one office building; Add one office building

By Use Permit

Lot Size (acres)

9.8 acres

9.8 acres

.51 acre min.

Lot Size (sq. ft.)

430,373 s.f.

430,373 s. f.

22,500 s.f.

Gross Floor Area (sq. ft.)

178,996

215,186 s.f. total

(demolished:

85,441 s.f.)

new :125,516 s.f.)

(remodeled:

95,989 s.f.)

150,630 s.f.

Lot Coverage (%)

20.3 %

20.6 %

45% max.

Floor Area Ratio (FAR)

40.6%

51%

35%max or Use Permit.

No. of Bldgs. On-Site

2

2

By Use Permit

Building Height (ft.)

38 ft.

One 2-story

One 3-story

75 ft. ma

8 stories x.

No. of Stories

2

3

8 max.

Setbacks

     

a. Front

78 ft.

78 ft.

25 ft.min.

b. Left Side (facing property)

155 ft.

155 ft.

20 ft.min.

c. Right Side (facing property)

260 ft. (average)

75 ft.

0 ft, min.

d. Rear

55 ft.

70 ft.

0' ft.

Landscaping (total sq. ft.)

82,000 s.f.

153,583 s.f.

90,780 s.f. min

a. Frontage (width ft.)

20 ft.

20-25 ft.

15 ft. min.

b. Based on Floor Area

45%

51%

10% min.

c. % of Site

19%

25.6%

20% min.

Total No. of Parking Spaces

550

692

430 min.

860 max.

a. No. of Compacts

0

76

76 min.

b. % of Compacts

N/A

10%

10%

c. No. of Standards

547

609

358 min. min358

d. No. of Handicaps

3

14

14 min.

ANALYSIS

Background

Previous Actions on the Site: The following table summarizes previous planning applications related to the subject site.

File Number

Brief Description

Hearing/Decision

Date

1990-064

Roof Screen

Approved

1/30/90

1985-00087UP

Mezzanine

Approved

6/28/89

1982-0162-UP

Microwave tower on roof

Approved

3/29/82

1978-0220-UP

Unenclosed storage and antennas

Approved

12/13/78

1977-0549

Subdivision

Approved

9/27/77

1999-1197

Use Permit to allow demolition of an existing building, remodel of a building and construction of a new 3-story office building.

Continuance

1/24/00

This item went to Planning Commission Public Hearing on January 24, 2000 and the applicant was granted a continuance to the Planning Commission Public Hearing on February 28, 2000.

In response to several issues raised during the Planning Commission Public Hearing on January 28, 2000, the applicant has made several modifications to the architecture, site plan, landscaping, and TDM Plan for the project. A copy of the summary of the approved Planning Commission Minutes for January 24, 2000 is Attachment 7. A letter from the Santa Clara Valley Transportation Authority is Attachment 8.

At the Planning Commission Public Hearing on February 28, 2000, the Planning Commission voted 4-0 to affirm the Mitigated Negative Declaration and approve the Use Permit with conditions. Commissioners Satterlee and Hornberger were absent; Commissioner Howe stepped down due to a conflict of interest. Condition of Approval #32 was added to address Commissioner Simons' concern that the tree selection for the parking landscaping will achieve 50% shade coverage within 15 years. A copy of the draft Planning Commission Minutes of February 28 is Attachment 10.

Description of Proposed Project

The applicant is proposing to demolish one currently vacant building, remodel an existing 2-story office building and build a new 3-story office building. The proposed project is a campus expansion of the properties located directly across Crossman Avenue. The subject site is located at the northeast corner of the intersection of Crossman Avenue and Java Drive with easy access to Highway 237.

The total proposed Floor Area Ratio (FAR) would be 51%, where 35% is allowed prior to approval of a Use Permit. A Use Permit is required for proposals greater than 35% FAR. The property directly across the street on Crossman Avenue is a Futures Intensification Site with a 50% FAR. The site has been recently developed at that level of development.

Environmental Review

A Mitigated Negative declaration has been prepared in compliance with California Environmental Quality Act provisions, as amended, in Resolution #193-86. The initial study noted issues related to traffic impacts. The traffic impact analysis did not identify any significant project specific traffic impacts; however, due to the project's cumulative environmental impact on traffic staff has included a project mitigation that the applicant contribute funds for future roadway network improvements, consistent with the City's mitigation framework for long term transportation impacts. A copy of the Mitigated Negative Declaration is Attachment 4.

Use Permit

Use: The proposed remodel and the new 3-story office building represents an expansion of the campus across Crossman Avenue. There is sufficient surface parking to serve the intensification of buildings on the subject site. The site is within walking distance to the light rail station at Java and Crossman.

Floor Area Ratio: The FAR controls the intensification of use on a specific parcel by limiting the amount of gross square footage of the building(s) relative to the parcel size. The proposed use at 51% FAR is more intense than the existing 40.6% FAR of the site. Within the M-S zoning district, a Use Permit is required for development above 35% FAR.

The difference between the 35% FAR and the proposed 51% FAR is a net increase in square footage of 42,509 square feet or 11.4% in FAR. The additional square footage is due to the demolition of an existing 85,441 square foot building and the construction of a new building (125,516 square feet).

Since the Planning Commission Public Hearing on January 24, 2000, the applicant has added a 6,319 square feet for a recreation area and café to the new building. This reduces the "actual" FAR from 51% to an "effective" FAR of 50%. The difference represents square footage devoted to non-employee generating areas in the buildings.

Due to the increase above 35% FAR, the proposal is subject to review using the project evaluation criteria for projects greater than 35% FAR. The criteria and evaluation is Attachment 1. The applicant has also provided a project description and justifications in Attachment 5. The applicant has also provided a summary of the issues raised during the Planning Commission Public Hearing and their responses to them.

Site Layout: There are two existing buildings on the 9.8-acre site. Both buildings are located toward the middle of the site, one closer to Crossman and one closer to Java. An existing building will be demolished, and the current building facing Crossman will be remodeled. The primary entrances for both buildings will face Crossman Avenue to the west and the driveway entrance to the site will be along the same frontage. The secondary building entrances will provide access to the plaza area to the side or rear of each building. The majority of the parking will maintain the existing configuration although additional surface parking and landscaping will be added after the demolition of one building.

The following Guidelines were considered in analysis of the project site design.

Design Policy or Guideline
(Site Layout)

Comments

New development shall enhance the character of its surrounding area through quality architecture, and landscaping and appropriate site arrangement

The proposed site plan enhances and complements the existing industrial neighborhood. The architecture is well designed and the site plan incorporates parking and landscaping, including a plaza for use by employees and visitors. The plaza will link the existing and new building as well as create outdoor dining space for the café. The plaza will also be the setting for the installation of artwork.

New development in an area with an established character shall be compatible with its surrounding development in intensity, design, setback, building form, scale, material, color and landscaping unless there are specific planning goals to change the character of an area.

The site plan provides adequate setbacks and an increase in landscaping from the earlier proposal. The new three-story building is compatible in scale and bulk with the intensity of development directly across Crossman Avenue. Drive (developed at 50% FAR: Futures Site E). Buildings to the east of the site are industrial and hotel uses and the location of the new building is a sufficient distance from these uses to be compatible. The remodeled building shares materials and design elements with buildings on sites abutting the subject site. The addition of glass "pop-out" elements at the corners of the buildings adds visual interest.

The design shall be sensitive to the characteristics of the existing surrounding development and take into consideration the existing natural constraints on the site.

Setbacks and the new building placement takes into account the surrounding development, including industrial and service uses.

Architecture: The architecture and design will include the remodel of one building and construction of a new building on the site. The new building is a contemporary design that conveys a "high-tech" image that is emerging within the Moffett Park area. The colors and materials include off-white pre-cast panels, blue-green low reflective/clear/spandrel glass and champagne colored metal. The materials and colors are similar to buildings on the remainder of the campus across the street.

The remodeled building will have a more contemporary styleand façade by adding elements to the existing concrete materials and reducing significant portions of the mansard roof. The ground floor will have a new concrete surround and infill glazing to match the pre-cast panels and glazing on the new building. The design will eliminate or hide the existing buttresses or pilasters.

Due to modifications to the exterior of the building, the windows will become more recessed and provide a shadow line and more visual interest to all facades. The narrow arched windows on the second floor will be replaced with rectangular windows with similar proportions and color (blue-green) to the new building.

The applicant has modified both the design and architectural elements to address concerns raised at the Planning Commission Public Hearing. The use of similar glass color and design and the introduction of vertical fins or elements break up the long horizontal lines of the remodeled and new building. These features and building material also link the remodeled building with the new building. The mansard roof line will be broken up into smaller segments and augmented with seam metal elements to tie to other buildings.

The covered arcade adjacent to the new building will have a sloped roof similar to elements of the remodeled building. Glass curtain walls will define the primary entries of both buildings; the new building will also have a "glass lantern" element that introduces angular features similar to buildings across Crossman. Molding has been added to provide additional texture and articulation. Along the north elevation of the new building there will be a covered pedestrian arcade, which also provides visual interest to the interior of the site.

The building mass and bulk of the buildings will be minimized through the use of a variety of building materials and finishes, and the use of vertical elements on all facades. The combination of design and building materials defines the top, middle and base of the new building.

The following Guidelines were considered in the analysis of the project architecture.

Design Policy or Guideline (Architecture)

Comments

New buildings shall maintain diversity and individuality in style while improving aesthetic character of their surrounding area

The proposed architectural style of the new building is attractive and will enhance the aesthetic character of the surrounding area. The new building combines pre-cast panels window openings and glass curtain walls. The remodeled building has a largely upgraded façade that matches the pre-cast panels of the new building while hiding or eliminating the existing buttresses. The use of glass "pop-outs" at the corners links the two buildings on the site and also tie with the design and building materials of the campus buildings across Crossman Avenue.

The use of varied materials and the use of vertical elements breaks up the façade of both the new and remodeled building

Main entrances of the buildings shall be well defined

Both buildings have well defined entries defined with a full height curtain wall at the front and rear entries of the remodeled building. The lobby entrance to the new building incorporates a "glass lantern" and its roof is sheathed in metal roofing to match the remodeled building. The angular entry elements also link the buildings to campus buildings across the street. The main entries are visible from both Crossman and Java.

New buildings shall have at least one major focal point and minor focal points. Focal points should be achieved through horizontal and vertical lines, change in material, change in color, changing the form and shape of a portion of the building, etc. Combining the main entrance and the focal points is encouraged.

Both the remodeled building and the new building have articulated, attractive entryways and a well-defined and functional plaza that incorporates artwork. The plaza will be a major focal point on the site.

 

A comprehensive material and color scheme shall be developed for each site.

The remodeled and new buildings share some materials and color which ties them together. The primary materials include glass, pre-cast concrete panels, and steel.

Landscaping: The proposal includes 153,583 square feet of landscaping which exceeds the minimum of 20% of the site. The proposed landscaping plan consists of 77% as softscape/plant materials and 23% as hardscape, including decorative paving in the plaza, the arcade area and pedestrian areas closer to the street frontage. The landscape palette uses a variety of species and the landscaping is located throughout the property. There is an existing 20-25 foot mature landscape buffer along Crossman and additional buffers are on all remaining perimeters. The east and north perimeters will be 5-feet and the south perimeter (along Java) will be approximately 25 ft. planted with various species of trees to provide a buffer.

The parking lot landscaping is extensive and introduces additional planting wells and landscaped areas throughout. The conceptual landscape plan retains a significant number of existing trees and mature landscaping on-site. The landscaping will also be complemented by the use of decorative paving in the plaza area where the applicant will install the artwork. To ensure protection of existing trees, the applicant will be required to submit a Tree Protection Plan, submit a revised landscape plan, and accommodate Best Management Practices related to surface run-off (Conditions of Approval #16,17, and 18).

The following Guidelines were considered in analysis of the project landscaping.

Design Policy or Guideline

(Landscape)

Comments

Landscaping shall be designed to enhance the overall aesthetic quality of the site

The project includes landscaping throughout the site and along the periphery. The revised landscape plan greatly increases the percentage of the site devoted to landscaping. There needs to be a clarification in the landscape plan regarding the landscape islands (Condition of Approval #17).

When appropriate, landscaping shall be used to enhance focal points, artwork, and visible areas

The project includes landscaping along all peripheries, throughout the site, and decorative paving is also used within the plaza to enhance the installation of artwork. Decorative paving is counted toward the landscaping square footage for the site.

A minimum of 15 foot wide landscape strip shall be provided along the public street frontages of project

There is an existing 20-25 foot landscape strip along the Crossman Avenue frontage. The proposal also includes 5 ft. landscaping buffer along the north and east perimeters and a 25-foot tree-planted buffer and swale along Java Drive.

Parking/Circulation: A minimum of one parking space per 500 square feet is required and a maximum of one space per 250 square feet is allowed within this zoning district.

The applicant reduced the parking spaces by 24 spaces; the revised proposal includes a total 692 parking spaces, which are approximately 3.2 spaces per 1,000 gross building square footage. The parking standards for this use require a minimum of 430 and a maximum of 860 parking spaces.

The project includes 69 compact parking spaces, 609 standard parking spaces and 14 handicapped parking spaces. The Sunnyvale Municipal Code requires that 10% of the parking spaces in industrial developments be reserved for carpool vehicles (71 spaces are designated for car pool vehicles). These spaces are located in close proximity to both buildings.

The bicycle parking has two components: 44 spaces for secure bicycle parking and 28 spaces for bike racks. The proposal also includes a campus-wide on-site bicycle system to link the buildings throughout campus. The applicant will stripe a bicycle lane along Crossman Avenue to promote additional bicycle usage in the industrial area (Condition of Approval #27). With its close proximity to the LRT station, it will also be possible for bicyclists to use LRT since bicycles are allowed on the LRT cars. Staff has included Condition of Approval #11 requiring that bicycle parking be provided in accordance with the Valley Transportation Authority’s bicycle parking guidelines. Bicycle parking is also a requirement of the Transportation Demand Management (TDM) program.

A pedestrian circulation plan ties the two buildings together and links the subject site to campus across Crossman. The pedestrian connections, including sidewalks and plaza areas, facilitate pedestrian access to the LRT station and bus stops in the vicinity.

The following Guidelines were considered in analysis of the project parking and circulation.

Design Policy or Guideline (Parking/Circulation)

Comments

Walkways and paths shall be provided in parking lots and provide a safe pedestrian access to buildings

The proposal includes several pedestrian features, including a plaza area, a covered pedestrian walkway, and a sidewalk to facilitate safe pedestrian access to and from the site and to connect with transit opportunities.

When landscape pockets are provided between parking spaces facing each other, the width of the islands shall be minimum of 6 feet. Landscape pockets shall also be provided for every 7 parking spaces and at the end of each row of parking spaces.

The conceptual landscape plans needs further modification to clarify that the projects shall include at least 6 feet wide landscape pockets in the parking lot and landscape pockets shall be provided for every 7 parking spaces (Condition of Approval #17).

Traffic:

The firm of Optrans prepared a Transportation Impact Analysis (TIA) for the project proposal; it was reviewed and approved by City staff. The TIA was prepared according to Santa Clara Valley Transportation Authority (SCVTA) Congestion Management Program (CMP) requirements. Intersection, freeway, and alternative transportation impacts were assessed per the CMP. The TIA also examined several non-CMP, City-controlled intersections. Seven intersections were studied for level of service impacts, including one CMP intersection.

The study found that the proposed project will not cause any violation of the City’s or the VTA’s baseline LOS policies in the project condition. The CMP TIA Guidelines also call for freeway and intersection left turn pocket capacity to be studied. No freeway or queuing impacts were identified.

At the time of data collection, the Tasman West light rail transit project was under construction. Assumptions were made to adjust traffic volumes for disruption of traffic patterns and volumes due to construction activity. A comparison of historic and current

traffic volumes resulted in minor increases in base traffic volume assumptions.

Site Circulation and Alternative Transportation Analyses

The TIA also analyzed project site circulation and alternative transportation impacts. The proposed project will install a sidewalk, and consolidate two driveways into one on the Crossman Avenue frontage. These constitute positive environmental impacts.

Sidewalks are absent on the Java Drive frontage of the project. Sidewalk in this area would partially complete a new pedestrian/ADA link between the north and south sides of Route 237. Because the project south frontage abuts the embankment for the Java Drive bridge over Route 237, the frontage is decidedly non-typical, and requires a higher level of feasibility analysis. However, relieving the applicant of the City requirement to provide sidewalks on project frontages should not be done without thorough engineering analysis.

A condition of approval is included to require the applicant to post a bond for the cost of embankment/guardrail modifications and construction of sidewalk on the Java Drive frontage of the property between Crossman Avenue and the Route 237 bridge. Staff will work with the applicant to further evaluate the feasibility of constructing sidewalk in this area (Condition of Approval # 28).

The project proposes to install bicycle parking as well, but at levels below those recommended in the Valley Transportation Authority Bicycle Technical Guidelines. A condition of approval is included to require the applicant to install bicycle parking per the VTA Bicycle Technical Guidelines (Condition of Approval #11).

The TIA identified that signs are posted prohibiting left turns from the southernmost driveway on Crossman Avenue. This is due to sight distance and intersection distance constraints. Considerable additional traffic will be added to this intersection by the proposed project. Therefore, it may be necessary to construct a physical barrier to left turn movements to reduce the potential for collisions.

Staff is recommending that the project include a condition of approval for the applicant to post a five year bond prior to project occupancy for construction of median improvements on Crossman Avenue at Java Drive along the projects south driveway. This will allow the City to evaluate whether a safety issue develops. The City reserves the right to call the bond within five years of project occupancy and construct this improvement (Condition of Approval #29).

Crossman Avenue Bicycle Lanes

In September 1999, the City completed a citywide bikeway planning study, called the Bicycle Opportunities Study. This study gives direction on rational approaches to providing a comprehensive network of bike lanes on City streets. The City will use this study as a guide over the long term for implementing bikeway improvements. Currently, staff is prioritizing projects and studies for implementing bike improvements.

The Bicycle Opportunities Study recommends that on-street parking be removed to accommodate bike lanes on Crossman Avenue. The detailed study and outreach required to investigate this action has not been scheduled. Staff’s approach would be to conduct the necessary public outreach and meetings for Council to consider this issue at a future date to be determined.

However, the applicant has agreed, as a means to encourage alternative transportation use by its employees and to promote bicycle use and bike facilities Citywide, to support removal of on-street parking on Crossman Avenue for construction of bike lanes (Condition of Approval #27). Support for this action constitutes a goodwill gesture on the part of the applicant, and will significantly accelerate provision of bike lanes on Crossman Avenue. This is a positive environmental impact.

Comments from the Santa Clara Valley Transportation Authority

During the review period, staff received a letter from the Valley Transportation Authority regarding the project (Attachment 8). The VTA supports the project and recommends that specific conditions of approval address the bus stop along Crossman. Staff concurs and has added Conditions of Approval # 30 to address the VTA concerns.

Cumulative Transportation Impacts

As a project requiring discretionary approval and subject to the California Environmental Quality Act (CEQA) provisions, staff has assessed the project’s cumulative environmental impact on traffic. The Sunnyvale Land Use and Transportation Element identifies a long term, citywide transportation system deficiency based on traffic increases from planned development. This project will add new trips that will contribute to the forecast transportation system deficiency. The project’s proposed FAR also is in excess of 35% criteria which exacerbates the cumulative traffic impacts already identified in the Land Use and Transportation Element. Therefore, staff is including as a project mitigation a condition that the developer will contribute funds for future roadway network improvements, consistent with the City’s mitigation framework for long term transportation impacts (Condition of Approval #31).

TDM Plan

In response to concerns by the Planning Commission, the applicant has proposed a TDM threshold of 18% for the subject parcel. The applicant has submitted a TDM Plan for the entire Network Appliances campus, including a voluntary self-imposed 15% TDM threshold for Phase 1 of the campus across the street. A copy of the TDM Plan is Attachment 9.

The plan includes a recreational area (including 10 showers and 84 lockers) and café on the subject and a bicycle pool and secure bicycle parking and racks for commuting and recreational opportunities. There are banking and dry cleaning services available on the portion of the campus across Crossman. The applicant proposes to retain a Transportation Coordinator to provide alternative transportation information and services, and will subsidize employee transit passes. A guaranteed ride home program is proposed to be developed. The applicant/tenant also allows flex time for employees. The Plan further notes the applicant’s support for removal of on-street parking for bicycle facilities, to promote bicycle use. The proposed program would represent a comprehensive and potentially effective TDM Program.

The Plan discusses telecommuting. City staff does not view telecommuting as a favorable means to reduce trips unless the telecommuter’s office space is not utilized for other activities. As the TDM Plan notes, many employers use telecommuting as a means for "hoteling" employees. Therefore, office space remains occupied and there is no reduction of base trip generation from the use.

The TDM Plan does indicate how the applicant will assure long-term trip reduction commitment to the 18% TDM goal. Amending the CC & R’s or lease agreements are options. Staff believes that in order to have a guaranteed, enforceable TDM component of a project, there needs to be a condition placed on the use of the land the commits to a trip reduction goal and commits to compliance with a City-determined penalty should that goal not be met.

A TDM Plan is not required for this site but has become a common tool for evaluation of the impacts of higher FAR projects. Recordation of the Use Permit conditions of approval will assure long-term notification of the requirement for the property to require the property owner or occupant to assure that at least 18% of employees on the site use alternative transportation to reach the site, as determined by an annual TDM survey.

The property owner or occupant will comply with City of Sunnyvale requirements for financial penalties should the TDM goal not be met (Condition of Approval #14).

Easements/Undergrounding: Sidewalks are required to be installed. Sidewalks will be installed along the Crossman frontage and the applicant shall post a bond for the cost of embankment/guardrail modifications and construction of sidewalk on the Java Drive frontage of the property between Crossman Avenue and the Route 237 bridge, based on an engineer’s estimate approved by the Director of Public Works (Condition of Approval #28). Easements for sidewalks are addressed in Condition of Approval #25.

All dedications, easements and agreements related to off-site improvements shall be required and provided by the applicant as deemed necessary by the Department of Public Works.

Art in Private Development:

In accordance with the Sunnyvale Municipal Code (SMC 19.52), non-residential sites over two acres are required to provide public art. The Planning Commission reviews the general location on the site; the selected artist, the artwork, and its final location are subject to the Arts Commission review and approval. The ordinance requires that artwork be visible from the street. The applicant has proposed that the artwork be located within the plaza between the two buildings. This is a visible location from both frontages and it will be focal point and will help to tie the two buildings together. The artwork will be installed prior to occupancy of the site (Condition of Approval #4).

Compliance with Development Standards

The proposed development meets or exceeds the development standards of the M-S (Manufacturing-Services) zoning district and complements the surrounding industrial area. Since the proposal is for a FAR greater than 35% FAR, a Use Permit is required. In addition, the proposal is subject to the project review criteria (Attachment 1) for projects greater than 35%. Staff has conducted an analysis using the criteria, and finds that the project merits consideration of a higher FAR. The application includes strong site plan, architecture and design elements.

General Plan

The following goals and policies were considered to determine conformance with the General Plan.

General Plan Sub-Element

Goal Or Policy

Comments

Land Use and Transportation Element

Goal C4: Sustain a strong local economy that contributes fiscal support for desired City services and provides a mix of jobs and commercial opportunities.

The proposal completes the second phase of a three-phase campus development in an industrial area. The expansion supports business and community needs.

Land Use and Transportation Element

Policy C4.2: Balance land use and transportation system carrying capacity necessary to support a vital and robust local economy.

The proposal allows industrial expansion of an existing campus. It also contributes to fair share mitigation of impacts on the roadway system.

Land Use and Transportation Element

Action Statement C4.2.1: Permit industrial FARs up to 35% (and allow warehouse FARs up to 50%), and permit higher FARs in the Futures intensification areas.

The proposed 51% FAR project is located directly across from a Futures Intensification of 50% FAR. The project is also subject to review criteria for projects greater than 35% FAR (Attachment 1).

Land Use and Transportation Element

Action Statement: C4.2.3: Develop incentive programs to reduce parking demand, support alternative transportation, and reduce peak period traffic.

The applicant has proposed a TDM program (18% threshold) to reduce the number of automobile trips generated by the site. The site is located within walking distance of the LRT station at Java and Crossman. The proposal also includes preferential car pool parking spaces, bicycle parking and storage, and an on-campus bicycle pool to link campus buildings.

Land Use and Transportation Element

N 1.8: Cluster high intensity industrial uses in areas with easy access to transportation corridors.

The proposed site is located in close proximity to Highway 237 and State Highway 101, both significant highway corridors in Sunnyvale and the region. The site is also served by many transit alternatives.

Land Use and Transportation Element

N1.10: Provide appropriate site access to commercial and office uses while preserving available road capacity.

The site has direct access from Crossman Avenue. The project can be accommodated without a significant impact on the existing roadway system.

Community Design Sub Element

Policy C.1: Place a priority on quality architecture and site design which will enhance the image of Sunnyvale and create a vital and attractive environment for businesses, residents and visitors, and be reasonably balanced with the need for economic development to assure Sunnyvale’s economic prosperity.

The proposed project is visible from both Crossman and Java; the site plan relates to its corner location. The proposal includes quality, distinctive architecture that works both on-site and in relationship to the remainder of the campus across the street. The campus expansion supports the economic prosperity goals of the City.

Expected Impact on the Surroundings

The proposal will be an intensification of use of the subject site, due to the addition of the new three-story building. The 9.8 acre parcel is sufficient to support buildings of this size and function. The location of the buildings and the landscaping will complement the architectural features of the buildings. A Traffic Impact Analysis study did not identify specific traffic issues associated with the proposal. Staff has determined, however, that mitigation of cumulative impacts is appropriate to offset the cumulative traffic impacts on continuing development within this sub-region of Sunnyvale. A mitigation amount has been calculated and is noted in Condition of Approval # 31.

The architecture and design of the buildings, including the landscaping, create an enhanced street presence at the intersection. The intersection is visible by car passengers, LRT passengers and pedestrians. The site plan and articulation of the buildings link the subject site to the remainder of the campus across Crossman Avenue.

Findings

In order to approve a Use Permit, either of the following findings must be made:

(a) Attain the objectives and purposes of the general plan of the city of Sunnyvale; or

(b) Ensure that the proposed use is desirable, and will not be materially detrimental to the public welfare or injurious to the property, improvements or uses within the immediate vicinity and within the zoning district. Any such permit likewise may be denied upon a finding that said permit, as requested, will not meet the foregoing standards for approval.

Conditions of Approval

As part of the review process, staff may recommend Conditions of Approval be placed on an application. These conditions clarify or modify the applicant's proposal in order to meet requirements imposed by the Municipal Code, policies and standards set forth by the General Plan, Special Plans and the City Council and other specifications that staff believes will enhance the visual character and/or add greater diversity to the City. The recommended Conditions of Approval are located in Attachment 3.

Fiscal Impact

No fiscal impact other than normal fees and taxes are expected.

Public Contact

Notice of the Mitigated Negative Declaration and the public hearings for this project were published in the Sun newspaper, posted on the site and mailed to the property owners within 300 feet of the project site.

The staff report for this project was posted on the City of Sunnyvale's Website and a copy of the report was provided at the Reference Section of the City of Sunnyvale's Public Library. The Planning Commission Agenda was posted on the City of Sunnyvale's Website and recorded for SunDial. The project was presented to the Planning Commission Study Session on December 13, 2000 and modifications were incorporated due to comments made during the discussion. This item went to Planning Commission Public Hearing on January 24, 2000 and the applicant was granted a continuance to the Planning Commission Public Hearing on February 28, 2000. A copy of the Planning Commission approved minutes for January 24, 2000 is Attachment 7. At the Planning Commission Public Hearing on February 28, 2000, the Planning Commission voted 4-0 to affirm the Mitigated Negative Declaration and approve the Use Permit with conditions. Condition of Approval #32 was added to address Commissioner Simons' concern that the tree selection for the parking landscaping will achieve 50% shade coverage within 15 years. Commissioner Hornberger and Satterlee were absent; Commissioner Howe stepped down due to a conflict of interest. A copy of the draft Planning Commission minutes of February 28, 2000 is Attachment 10. This report is scheduled for the City Council Public Hearing on March 7, 2000.

Alternatives

  1. Support the Planning Commission recommendation to affirm the Mitigated Negative Declaration and approve the Use Permit subject to the Conditions of Approval.
  2. Support the Planning Commission recommendation to affirm the Mitigated Negative Declaration and approve the Use permit with modifications.
  3. Affirm the Mitigated Negative Declaration and deny the Use Permit.
  4. Not affirm the Mitigated Negative Declaration and direct staff as to where additional environmental analysis is required.

Recommendation

Alternative #1.

 

 

Prepared By:

 

Gail A. Price
Principal Planner

 

Reviewed By:

 

Trudi Ryan
Planning Officer

 

 

Reviewed By:

 

David S. Boesch, Jr. Director
Community Development Director

 

 

Approved By:

 

Robert S. LaSala
City Manager

 

Attachments:

  1. Project Review Criteria for Projects Greater than 35% FAR
  2. Findings
  3. Conditions of Approval
  4. Mitigated Negative Declaration
  5. Site and Architectural Plans
  6. Project Description and justification from the applicant.
  7. Approved Minutes of the Planning Commission Public Hearing of January 24, 2000.
  8. Letter from the Santa Clara Valley Transportation Authority
  9. Applicant Project Summary Booklet, including Transportation Demand Management (TDM) Plan
  10. Draft Minutes of the Planning Commission Public Hearing of February 28, 2000.

 

 

Review Criteria for Projects Greater Than 35% FAR

Certain development in excess of 35 percent floor area ratio (FAR) in Industrial Zoning Districts (M-3 or M-S) requires approval of a Use Permit. In addition, to assist the decision-makers in considering higher FAR developments, the following review criteria will be used. These review criteria were adopted by the City Council on May 4, 1999.

Review Criteria

Discussion/Explanation

CATEGORY I: Community Character addresses the issues of land use and transportation capacity and neighborhood compatibility within the context of an overall City image.

Is there sufficient current and future land use and transportation capacity to incorporate this project?

 

The current "development pool’ has been adjusted for projects that have been approved since the creation of the development pool. The current development pool consists of approximately 3.1 million square feet. The project would use approximately 42,509 square feet of the pool.

The traffic impact analysis did not identify any traffic impacts associated with the project. However, due to cumulative growth in the region and impact on the transportation network, the applicant will also participate in cumulative traffic mitigation. The site is located on major transportation corridors and in close proximity to bus and light rail services.

Does project use and design contribute positively to a City image and community character that reflects current and future "high-tech" Silicon Valley?

The site plan and elevations meet the Citywide design guidelines. Both the remodel and the new building design contribute positively to the "high-tech" image of the City and the non-residential areas of the surrounding Silicon Valley. The redevelopment of the site creates a unified, high-tech corporate campus. It establishes an attractive "gateway" to the LRT station. The proposed development is consistent with the on-going redevelopment of the surrounding Moffett Park area with multi-story office structures and related amenities. The redevelopment of the site will create a unified, high-tech corporate campus that is a "gateway" to this neighborhood from the light rail station. T

Does the project include minor upgrading of the building for safety or special function purposes?

N/A

Have potential adverse impacts on nearby land uses been avoided, minimized or mitigated?

The site is located in an industrial area and also abuts a hotel use to the east of the site. The landscaping and the location of the buildings however, will minimize disruption to these other uses in the area. The major transportation corridors are Crossman Avenue and Java Drive, including the LRT alignment along Java Drive. There are no other sensitive users in the immediate vicinity.

CATEGORY II: ENVIRONMENTAL: TRAFFIC AND AIR QUALITY focuses on the ability of a proposed project to avoid, minimize or mitigate City-wide and local traffic and air quality impacts.

Does the project avoid or mitigate significant effects on the regional or City-wide roadway system?

Is the project sited to avoid impacts on constrained intersections or roadway segments?

The project is located at the intersection of Java and Crossman. The net additional square footage is 36,190 square feet. A traffic impact analysis has not identified traffic impacts or mitigations for this project beyond participation in the cumulative traffic mitigation. Primary site access is from Crossman. The subject site is also within easy access of Highway 237.

The site is adjacent to the LRT station at Crossman and Java. In addition, the applicant has proposed a TDM program to meet a 18% trip reduction threshold based on peak hour trips. A self-imposed TDM threshold of 15% has also been imposed on Phase 1, existing and buildings under construction across Crossman Avenue. Further details are noted in the TDM Plan (Attachment 9).

Are potential air quality impacts mitigated?

No significant impacts were identified in the Traffic Impact Analysis. The applicant is proposing a travel demand management program to reduce peak hour project trips by 18%. A monitoring program for the TDM plan is also being implemented. Reductions in all trips and especially peak hour trips will reduce the adverse impact to air quality.

Does the project provide opportunities for appropriate on-site retail/support services and amenities to minimize mid-day vehicle trips?

The project includes a recreational area (including 10 showers and 84 lockers) and café on-site. The subject site will also have a valet dry cleaning service to serve the site. There are also additional amenities currently under construction (eg dry cleaning and banking) across Crossman Avenue. Users of the site also can use the LRT to connect to retail services in the vicinity.

The applicant has provided a TDM program to reduce the number of trips generated. Proximity to additional services at the adjacent campus will also provide opportunities for employees of this site.

Does the project provide mixed uses on the site to complement the primary use and adjacent land uses?

The project is not a mixed-use development since it is an expansion of a campus directly across the street, which has support services and amenities.

Is the project located in close proximity to a light rail or Cal-Train station, and/or other convenient transit stops?

A VTA bus stop is located along the Crossman frontage of the site and within easy walking distance to the light rail station. The TDM Plan will promote and encourage employees to use transit and other trip reduction measures. There is also a Altamont Commuter Express (ACE), a commuter choice program and shuttles connecting to Caltrain stations.

Can identifiable and measurable negative impacts on City infrastructure and services be mitigated?

Physical improvements to the transportation system will be provided in the future by applicant participation in cumulative traffic mitigation. The applicant proposes a TDM program. Staff has not identified other City services or infrastructure that would be affected by the proposal.

Is a Transportation Demand Management program planned for the site? Does it reduce traffic general and promote transit use?

A TDM program is proposed for the site. The program includes the following key features:

  • 18% trip reduction (and self-imposed 15% trip reduction threshold for Phase 1 campus across Crossman).
  • Transit service
  • Transit subsidy available for up to 5% of the employees.
  • Designated carpool/vanpool parking spaces.
  • Bicycle parking and storage
  • Bicycle program to service campus buildings
  • RIDES' bicycle program/RIDES' Bike Buddies
  • Commuter choice program
  • Connection to the Altamont Commuter Express (ACE)
  • Shuttles to Caltrain
  • Transportation coordinator to provide information and promote alternative modes.
  • Annual report on trip reduction performance.
  • Telecommuting and flexible work hours.

The applicant has also included a recreational area, café, and dry cleaning valet services to the subject site.

CATEGORY III: SITE DESIGN AND ARCHITECTURE addresses several components of site design and architecture; focusing on the visual features and aesthetics, techniques to reduce the bulk and mass of the buildings, ways to reduce the amount of surface parking on the site.

Does the project demonstrate exemplary architecture and design through:

  • use of unique and/or high quality building materials, singly and in combination
  • state of the art design and materials
  • introduction of significant, innovative and noteworthy architectural forms and elements
  • special or unique features of the site plan design and implementation

The buildings demonstrate high quality architecture and complement buildings in the immediate vicinity. The materials include a combination of integral colored precast concrete panels and low reflective spandrel glass, metal, and aluminum windows. The materials are similar to those used in other high quality development in Silicon Valley. The combination of distinctive entry features and the use of angular elements, and changes in building materials and articulation create a distinctive street presence. The updated remodeled building, as conditioned, ties to both the new building and campus buildings across the street. The glass entry features will provide distinctive entry lobbies.

A sloped metal roof form has been added in two locations on the new building. The locations include the arcade and the entry to the new building. The corner glass elements and arcade elements tie the two buildings together. The new building has additional precast concrete wall panels with glass infill (punched openings) have been added to the rear elevation.

Does the project complement the City image and community character currently primarily low profile with a less intensive development density?

The buildings are designed for high-technology users and complement redevelopment within the Moffett Park industrial area of Sunnyvale. The architecture is contemporary, utilizing design elements and building materials more widespread during the past 5 years in Silicon Valley. The subject site development links and reflects many elements and materials of the campus design across Crossman, thereby promoting a specific neighborhood character.

 

Does the site plan reduce the bulk and mass of the buildings on the site? Are the following techniques and others used in a creative and resourceful way?

  • Façade and roofline variations
  • Reduction in the building footprint and significant increase of landscaping required by Zoning Code
  • Substantially greater setbacks than required by the Zoning Code.

The two separate buildings reduce the bulk and mass of the overall project. Since the net addition is 42,509 square feet, staff considers the overall change of intensity to be minimal. There is a minimal increase in overall site coverage. The facades of both buildings incorporate vertical elements varied materials and colors. The use of recessed windows creates additional shadow lines to provide visual interest to the buildings. The buildings are offset from one another from Crossman and this also reduces the visual impact of the 3-story building. The Highway 237 bridge rises above the southern boundary of the parcel and its serves to reduce the impact, also.

Setbacks range form 80 to 250 feet feet where 35 feet is required.

Does the site plan include techniques to reduce non-point source pollution?

The landscape plan will be modified to incorporate specific non-point source and storm drain management element (Condition of Approval #18 and #23).

Is a reduction in the amount of surface parking achieved?

  • Significant reduction in the number of surface parking spaces
  • Provision of structured parking and/ or underground parking

Introduction of a landscape reserve that can be converted to parking on an as-needed basis, or as a permanent park.

The parking is less than the maximum allowed for the expansion and represents the maximum parking allowed for the existing square footage. A significant reduction in parking, however, has not been demonstrated although this is a reduction of 24 spaces from the earlier proposal. There is no structured or underground parking. The geological conditions preclude underground parking and the parcel size and existing building footprint would limit options for structured parking. The applicant has not proposed a landscape reserve.

The applicant has also proposed a Transportation Demand Management Plan to promote alternative transportation modes. The applicant has also agreed to support the elimination of on-street parking along Crossman Avenue (approximately 75-100 spaces).

 

Is the site comprehensively planned through the creation of a Master Plan or Site Specific Plan? Has a long-term development plan been prepared that allows phasing of the project based on implementation of improvements and mitigations?

Due to the site size, the project will not be phased. However, this is the second phase of the campus development. Along Crossman. The links between the various parts of the campus are achieved through pedestrian access, landscaping, building design, color and building materials. .

How is the calculation of the "effective" FAR being conducted? Does the size of the project warrant a different method of calculating the FAR?

The design of the buildings includes non-employee-generating spaces, including a recreational area and café, which contribute to the calculation of an "effective" FAR. The "actual" FAR is 51% and the "effective" FAR is 50% FAR.

CATEGORY IV: ECONOMIC, FISCAL AND COMMUNITY BENEFIT identifies the need to relate the project to the economic prosperity program of the City, potential impact on the City, the relationship to the local economy and employment in terms of the types and numbers of jobs likely to be generated by the project and other features of the development that will result in an overall positive community benefit. The following questions provide examples of how benefit can be described. Please respond to as many as apply.

1.

Implement the goals of the economic prosperity program?

· Maintain high quality of life through stable tax base.

· Enhance Sunnyvale’s position in the tech economy.

The Network Appliance application implements several goals of the Economic Prosperity Program, including business retention and attraction and innovation. It is a redevelopment of the site and encourages local expansion. The application promotes the continued growth of Network Appliance as the Phase 2 of a campus master plan. The project also addresses several goals of the Sunnyvale General Plan (see report beginning on page 15).

Network Appliance is the fastest growing company of its size in Sunnyvale and Silicon Valley.

The increase in the FAR is consistent with the "Four Goals with Progress Measures for an Innovative Economy in 2010" of the Joint Ventures 2010 Report. The applicant qualifies as a "gazelle" in terms of economic growth and supports a relatively high portion of the R&D employment as a percentage of total employment.

 

Review Criteria

Discussion/Explanation

2.

Positive net fiscal impact over the next 5-20 years?

The project can be expected to generate the following:

  • The project is part of a large campus that has a "point of sale" office which will contribute to property tax revenues.
  • On a one-time basis, the estimated Building Permit fees and construction tax will be approximately $90,597.
  • The City share of property taxes has been estimated to be $62,8119 over five years and $294,800 over 20 years

The magnitude of the goods and services that will be purchased in the local community by employees and visitors cannot be estimated.

With the completion of this project, Network Appliance should be the second largest taxpayer in Sunnyvale (measured by sales, real and personal property tax collections).

3.

Does the project include provisions for on site corporate headquarters?

The project is a portion of an existing corporate campus headquarters which has a "point of sale" office in Sunnyvale.

4.

Project provide resident and youth employment options?

The total number of jobs will be approximately 750 for the subject site, although the total campus job number will be approximately 2100 (for Phases 1 and 2). The project will have a variety of high technology jobs that could provide job opportunities for residents. A specific youth employment focus has not been identified.

5.

Anticipated jobs (types & numbers) complement the current and future job profile in Sunnyvale?

A project this size is anticipated to create 750 high quality jobs (+/- 5%). Anticipated jobs will be in the high tech sector, either software, hardware, or communications engineering, and related management and support functions. These jobs are consistent with the current campus job profile.

The mid-sized companies that would best utilize this size of facility are some of the fastest growing and most dynamic in Silicon Valley, identified as "gazelles" in the Joint Venture Silicon Valley 2010 report. Once attracted to the site they should become long term Sunnyvale based companies, bringing with them quality employment opportunities.

6.

To what degree do the proposed jobs generate related jobs and services in Sunnyvale?

Using industry multipliers from the U.S. Department of Commerce an estimated 2.2 dollars in additional output are generated for every dollar of initial salary. Assuming an average salary of $75,000 for the 500 net new Sunnyvale jobs to be created.

 

Based on the same multiplier information for every job created in this industry sector (electronics) three additional jobs are created in the community. This would lead to an estimate of 1500 additional jobs created in all industry segments.

7.

Project intended for a single user or common shared management?

The proposal is part of a campus and will have a common shared management.

8.

Community benefits that could be attributed to the proposed project?

· Art in public development fund.

 

· Contributions to community programs.

 

 

 

· City capital improvements.

 

The project is subject to the art in private development ordinance. The Code requires that the art be visible from the public right-of way. This portion of the campus complements recent building expansion of the campus across the street. An expansion of this size will make a significant contribution to the economic vitality of Sunnyvale.

The applicant did not identify specific contributions to community programs but that does not preclude the possibility of contributions in the future.

The provision of a public sidewalk along Crossman will facilitate safe pedestrian movement and make progress toward the City's goal of providing sidewalks in industrial areas. Additionally, the applicant will bond for the cost of embankment/guardrail modifications and construction of sidewalk on the Java Drive frontage of the property between Crossman Avenue and the Route 237 bridge. Staff will work with the applicant to further evaluate the feasibility of constructing sidewalk in this area.

 

Findings - Use Permit: 1999-1197

  1. The proposed use attains the objectives and purposes of the General Plan of the City of Sunnyvale as the project addresses the following:

Land Use and Transportation Element

Neighborhood N1.8: Cluster high intensity uses in areas with easy access to transportation corridors

The proposed project is located immediately across the street from a 50% FAR (Futures Intensification Site). The subject project is Phase 2 of a campus master plan. The site is located within easy walking distance to the LRT station at Java and Crossman. In addition, the site is served by other transit options, there are established shuttles services, and there is easy access to Highway 237.

R.1.9 Support flexible and appropriate alternative transportation modes and transportation system management measures that reduce reliance on the automobile and serve changing regional and City-wide land use and transportation needs.

The applicant has a TDM program with a 18% threshold, including a voluntary implementation of a 15% TDM program for Phase 1 across Crossman Avenue. It includes many elements to offset the traffic generation associated with the project.

Community Design Sub-Element

Policy C.1: Place a high priority on quality architecture and site design which will enhance the image of Sunnyvale and create a vital and attractive environment for businesses, residents, and visitors, and be reasonably balanced with the need for economic development to assure Sunnyvale's economic prosperity.

The remodeled and new building demonstrate attractive design and a variety of architectural features, enhanced entries, a variety of building materials, colors and textures. This gateway location at the LRT station is widely visible and demonstrates the quality of redevelopment activity in Moffett

  1. The proposed use is desirable, and will not be materially detrimental to the public welfare or injurious to the property, improvements or uses within the immediate vicinity and within the Zoning District because the site redevelopment remodels an existing building and the new 3-story building is only adding 42,509 square feet to the building square footage and intensity. The remodeled building is a re-sue of an existing building. The overall architectural quality is high and the design elements and landscaping have a positive aesthetic impact on the immediate industrial neighborhood.

Conditions of Approval Use Permit: 1999-1197

In addition to complying with all applicable City, County, State and Federal Statutes, Codes, Ordinances, Resolutions and Regulations, Permittee expressly accepts and agrees to comply with the following conditions of approval of this Permit:

General

  1. The Conditions of Approval shall be reproduced on one page of the plans submitted for a Building Permit for this project.
  2. Execute a Use Permit document for recordation with the County Recorder prior to issuance of a Building Permit.
  3. Consult with the Crime Prevention Division of the Public Safety Department for crime prevention measures appropriate to the proposed development prior to issuance of a Building Permit.
  4. Comply with Art in Private Development municipal code requirements prior to occupancy. Locate art visible from Crossman Avenue and Java Drive in the plaza area between the two buildings. A bond for 1% of total construction costs shall be posted to ensure completion of artwork prior to issuance of building permits.

Operating Standards

  1. All exterior trash shall be confined to approved receptacles and enclosures.
  1. Trash enclosures to be a minimum of 6 feet high and enclosed on all four sides, of a design, approved by the Director of Community Development prior to issuance of building permit. Install enclosure prior to occupancy.
  2. The enclosure shall match the design, materials and color of the main building.
  1. As required by code, the property will comply with all requirements of the Noise Ordinance.

Architecture and Design

  1. Any major site and architectural plan modifications shall be treated as an amendment of the original approval and shall be subject to approval at a public hearing before the Planning Commission, except that minor changes of the approved plans may be approved administratively by the Director of Community Development.

Access, Circulation and Parking

  1. Submit a parking and circulation plan to the Director of Community Development for review and approval prior to the issuance of a Building Permit.
  2. The plan shall include: designation of on-site parking, including designated areas for employees, visitors, handicapped parking, vanpool, and carpool spaces. All such areas shall be clearly marked on Building Permit plans prior to the issuance of Building Permits.
  3. As proposed, a total of 10 percent preferential parking spaces shall be reserved and so marked in the closest possible rows adjoining the building allowing for car/vanpool carrying at least two employees per vehicle and clean fuel vehicles.
  4. Install covered and secured bicycle parking per VTA Bicycle Technical Guidelines. Submit a bicycle-parking plan for review and approval by the Director of Community Development prior to issuance of building permits.
  5. Design parking surfaces and landscaping to contribute to effective storm water management.
  6. Operate a Transportation Demand Management (TDM) program to achieve a 18 percent trip reduction goal. Percentages are based upon the total number of employees over a 24-hour period. Submit an annual progress report for City review on January 1 each year. If through review of the annual report, it is determined that the vehicle trip reduction goal is not being met, a revised TDM shall be submitted for approval by the City.
  7. The TDM program:
  1. Shall be approved by the Director of Community Development prior to issuance of a Building Permit.
  2. Shall apply to the property identified in the Use Permit 1999-1197 regardless of ownership or use.
  3. Shall incorporate a schedule of monetary fines for non-compliance of the TDM goals (schedule to be determined by Director of Community Development).

Landscape

  1. Landscape and irrigation plans shall be submitted to the Director of Community Development for approval prior to issuance of a building permit. Landscaping shall be planted prior to occupancy. The landscape plan shall include the following elements:
  1. Ground cover shall be planted so as to ensure full coverage eighteen months after installation.
  2. Consult with the Trees and Landscaping Division of the Pubic Works Department regarding the provision of street trees along Crossman Drive and Java Avenue frontages of the subject property.
  3. Ground cover shall be planted so as to ensure full coverage eighteen months after installation.
  4. All areas not required for parking, driveways or structures shall be landscaped.
  5. All landscaped areas shall have an appropriate irrigation system.
  6. Provide undulating landscape mounds along street frontages up to 3-feet in height.
  1. Prior to issuance of a Demolition Permit, a Grading Permit, or a Building Permit, which ever occurs first, obtain an approval of a Tree Protection Plan from the Director of Community Development. Utility Plans and Site plans shall be adjusted to ensure that healthy mature trees are saved.
  2. Submit revised site and landscaping plans to clarify the 6 ft. landscape strips located in the parking lot and the number of trees relative to the number of parking spaces in accordance with the Sunnyvale Municipal Code. Plans shall be reviewed and approved by the Director of Community Development prior to issuance of a building permit.
  3. The landscape plan will accommodate Best Management Practices (BMPs) to promote post-construction stormwater quality standards.

Lighting Plan

  1. Submit exterior lighting plan, including photometrics, fixture and pole designs of all poles, for approval by the Director of Community Development prior to issuance of a Building Permit. Driveway and parking area lighting shall include the following:
  1. Sodium vapor (or illumination with an equivalent energy savings).
  2. Pole heights (including the base and fixture) shall not exceed 18 feet in the front portion and 8 feet along the rear property line. Anti-glare shields shall be installed to ensure that no over-spill light or glare occurs on the adjacent properties.
  3. Provide photo cells for on/off control of all security and area lights.
  4. All exterior security lights shall be equipped with vandal-resistant covers.
  5. Wall packs shall not extend above the roof or parapet of the building.

Housing Mitigation

  1. Comply with Housing Mitigation Policy, which includes an estimated Housing Mitigation Fee ($7.19/s.f. above 35% FAR) of up to $260,206 for the proposed 51% FAR project prior to issuance of a Building Permit. The calculation is based upon the net additional square footage added (36,190 square feet) multiplied by the $7.19 per square foot. The calculation excludes non-employee generating areas such as the café and recreational area.

Infrastructure and Public Utilities

  1. All overhead utility lines and service drops shall be undergrounded. A copy of an agreement with PG&E for undergrounding of existing overhead utilities which are on-site or within adjoining rights-of-way shall be provided to the Director of Community Development prior to issuance of a Building Permit or a deposit in an amount sufficient to cover the cost of undergrounding shall be made with the City.
  2. The applicant shall comply with all provisions of National Pollutant Discharge Elimination System (NPDES) permit, including preparation and implementation of a Storm Water Pollution Prevention Plan for construction of this project.
  3. The applicant shall contact the City’s Environmental Division at (408) 730-7260 regarding water pollution control measures (related to sanitary and storm sewer discharges) to be incorporated into the project construction, design and operation.
  4. Existing and proposed on-site and street frontage electrical, telephone and cable TV services shall be placed underground or removed prior to occupancy (MC 19.46.060).
  5. Obtain Public Works approval of plans for utility line extensions, utility connections, meter locations, driveways, and sidewalks, including appropriate easements.The applicant shall install a sidewalk along the Crossman Avenue frontage, and consolidate two driveways into one along the same frontage.
  6. The applicant will construct bicycle lanes along Crossman Avenue. The plans will be subject to review and approval by the Director of Department of Public Works.
  7. The applicant shall post a bond for the cost of embankment/guardrail modifications and construction of sidewalk on the Java Drive frontage of the property between Crossman Avenue and the Route 237 bridge, based on an engineer’s estimate approved by the Director of Public Works. Period of the bond shall be five years. The City reserves the right to call the bond within five years of project occupancy and construct this improvement.
  8. The applicant shall post a five-year bond prior to project occupancy for construction of median improvements on Crossman Avenue at Java Drive along the projects south driveway, based on an engineer’s estimate approved by the Director of Public Works. The City reserves the right to call the bond within five years of project occupancy and construct this improvement.
  9. In accordance with recommendations by the Santa Clara Valley Transportation Authority regarding the bus stop along Crossman, the applicant will provide the following improvements for the bus stop:
  1. A minimum 22-foot curb lane or bus duckout consistent with VTA Bus Duckout Standards
  2. PCC Bus Stop Pavement Pad consistent with VTA Bus Stop Pavement Details
  3. Wheelchair curb ramps at all street and driveway intersections, in compliance with Americans with Disabilities (ADA) standards.
  4. A minimum 8-foot wide sidewalk adjacent to the bus stop, consistent with ADA bus stop access standards.
  1. In order to mitigate cumulative impacts to the roadway system in Sunnyvale as identified in the Land Use and Transportation Element of the General Plan, the developer shall contribute funds for future local roadway network improvements consistent with the City’s mitigation framework for long term transportation impacts, as determined by the Director of Community Development. Fair share is estimated to be $203,609. Mitigation contribution shall be made prior to issuance of a building permit.
  2. The tree selection for the parking landscaping will achieve 50% shade coverage within 15 years.

PLANNING DIVISION File Number 1999-1197
CITY OF SUNNYVALE No. 99-38
P.O. BOX 3707
SUNNYVALE, CALIFORNIA 94088-3707

 

MITIGATED NEGATIVE DECLARATION

This Mitigated Negative Declaration has been prepared in compliance with the provisions of the California Environmental Quality Act of 1970, as amended, and Resolution #193-86.

PROJECT TITLE:

Application for a Use Permit by Trinet Essential Facilities.

PROJECT DESCRIPTION AND LOCATION (APN):

To allow demolition of an existing building, a remodeling of an existing building and construction of a 3-story office building with a FAR (Floor Area Ratio) of 50% where 35% is allowed without a Use Permit. The property is located at 1260 Crossman Avenue in an M-3 (General Industrial) Zoning District. (APN: 110-36-020).

FINDINGS:

The Director of Community Development of the City of Sunnyvale, California, hereby determines that an environmental impact report is not required. There are sufficient environmental controls incorporated into the zoning regulations to ensure no significant detrimental effect.

The above determination is based on information provided by the applicant in an "Application for Environmental Clearance" and is based on the fact that the use is not in conflict with the adopted General Plan and the Zoning Ordinance; that site and architectural control will be exercised over the proposed development by the City Council.

Mitigation Measures:

Cumulative traffic impact mitigation shall be provided. The applicant will contribute funs for future roadway network improvements, consistent with the City's mitigation framework for long-term transportation impacts. The applicant will post separate bonds related to costs of required infrastucture improvements noted in the staff report and will install bicycle parking per the Valley Transportation Bicycle Technical Guidelines.

This Mitigated Negative Declaration may be protested in writing by any person prior to 5:00 p.m. on January 18, 2000. Such protest shall be filed in the Department of Community Development, 456 W. Olive Avenue, Sunnyvale and shall include a written statement specifying anticipated environmental effects which may be significant. A protest of a Negative Declaration will be considered by the adopting authority, whose action on the protest may be appealed.

 

Circulated On December 29, 1999

Signed:

Gail Price
Principal Planner

 

Adopted On March 7, 2000

Verified:

Gail Price
Principal Planner