May 13, 2003
|
SUBJECT: |
Award of Bid No. F0204-81 to Coordinate Traffic Signals on Mathilda Avenue, Fair Oaks Avenue and Wolfe Road (RTC#03-169) |
|
REPORT IN BRIEF |
||
|
Approval is requested for the award of a contract to Rosendin Electric, Inc., of San Jose to coordinate traffic signals on Mathilda Avenue, Fair Oaks Avenue and Wolfe Road (known as the Adaptive Traffic Signal Interconnect Project) for the Department of Public Works Project Administration Division (Project #TR-01/01-02). |
||
|
BACKGROUND |
||
|
In 1999, the City of Sunnyvale received a Transportation Fund for Clean Air (TFCA) grant to replace the traffic signal coordination system on Mathilda Avenue, Fair Oaks Avenue and Wolfe Road with a new computer-controlled system. The existing traffic signal coordination system on Mathilda Avenue and Wolfe Road was installed in the 1980s and can no longer be maintained. The manufacturer is no longer in business, and spare parts are difficult to find. Staff has chosen two systems to be implemented on these arterials, based on the different characteristics of the roadway, traffic using the system, and existing equipment. The new systems will vary coordination cycle lengths, based on existing traffic conditions, minimize delay to sidestreet traffic, and reduce congestion. This project includes the installation of the required traffic loop for the two systems to function, completion of intersection-to-intersection communications, and bringing all project intersection communications back to City Hall. |
||
|
DISCUSSION |
||
|
Bid specifications were prepared by Public Works and Purchasing staff. The Notice Inviting Bids was published in The Sun on April 9, 2003. The bid package was distributed to Bay Area Builders Exchanges and broadcast to potential contractors through the DemandStar by Onvia procurement network. Seven contractors requested bid documents. Sealed bids were publicly opened on April 23, 2003. Three responsive bids were received. |
||
|
Bidders |
Total Bid |
|
|
Engineer's Estimate |
$400,000 |
|
|
Rosendin Electric, Inc., of San Jose |
$322,000 |
|
|
Tennyson Electric, Inc., of Livermore |
$389,150 |
|
|
Prism Engineering, Inc., of Hollister |
$394,475 |
|
|
Staff recommends acceptance of the bid from Rosendin Electric, Inc., the lowest responsive and responsible bidder. A determination was made that this project will have significant effect on the environment in accordance with CEQA guidelines for categorically exempt projects. |
||
|
FISCAL IMPACT |
||
|
Project costs include: |
||
|
Construction |
$322,000 |
|
|
Contingency (15% of construction costs) |
48,300 |
|
|
Total cost |
$370,300 |
|
|
Funds are available in capital projects: 820160 - Mathilda Avenue Traffic Signal Controller Replacement 820161 - Central Sunnyvale Arterial Management 820190 - Traffic Signal Underground Replacement The funding source for Project 820160 and 820190 is General Fund; the funding for 820161 is a TFCA grant received in FY 2000/2001. |
||
|
RECOMMENDATION |
||
|
It is recommended that Council: |
||
|
||
|
Prepared by: |
||
|
Reviewed by:
Marvin Rose |
||
|
Approved by: |
||
|
Attachments |
||
|