Reports

April 15, 2004
April 21, 2005
August 15, 2005
August 19, 2004
December 16, 2004
December 18, 2003
February 19, 2004
February 20, 2005
January 15, 2004
January 20, 2005
July 15, 2004
July 21, 2005
June 16, 2005
June 17, 2004
March 17, 2005
March 18, 2004
March 31, 2005
May 19, 2005
May 20, 2004
November 18, 2004
November 20, 2003
October 21, 2004
September 16, 2004


 

 

 

 

Sunnyvale Bicycle and Pedestrian Advisory Committee

April 21, 2005

Staff Reports

 

Consent Calendar Items

 

1.A) Draft Minutes from March 31, 2005

Attached (Attachment 1).

 

1.C) 2005 Calendar

Attached (Attachment 2).

 

Public Hearings/General Business

 

2.       Frances Street Transit Center – Conceptual Design

 

The City of Sunnyvale is initiating a project to improve the bus facilities located on Frances Street between Evelyn Avenue and Cappella Way and create a cohesive link between bus stops and the Mulitmodal station.

 

The project could consist of the following improvements:

  1. Three custom bus shelters
  2. Enhanced crosswalks, including a mid-block crossing from the Plaza del Sol to the Frances Street parking lot
  3. Sidewalk and light treatments consistent with the new downtown standards
  4. Improved waiting and seating area  and bicycle parking facilities
  5. A VTA drivers/public restroom (this could require the loss of parking spaces).

 

Staff will present the Conceptual Design Concepts currently under review.   

 

3.       Pedestrian Opportunities Study – Existing Conditions Methodology 

 

A draft methodology for the data collection along the Arterial and Collector streets for the Pedestrian and Safety Opportunities Study has been completed. This methodology will be presented to the committee. Staff asks that the committee review and comment on the proposed data collection effort. 

 

4.       Bike to Work Day Planning    

 

The designated Bike to Work Day (BTWD) for the Bay area is Thursday, May 19, 2005. Staff will provide an oral staff report detailing coordination efforts to date.

 

5.       Bicycle Map Revision

 

Staff is in the process of completing the Sunnyvale Bicycle Map Revision. This is a 2005 Study Issue. At this meeting, staff would like to determine what text and information should be provided on the map other than the map itself. This could include safety information and tips, useful contacts, ect. Samples will be provided from the existing bike map and various other sources for discussion. Please bring examples of information that you think should be included.

 

6.       FY 05/06 TDA Allocation

 

Staff has received a call for projects for 2005/2006 Transportation Development Act (TDA) grants. These funds are available for bicycle and pedestrian projects and the City is guaranteed to receive $96,048 if allocation is requested.

The construction bids for the Calabazas Creek Trail have been submitted and have come in higher than expected. An additional funding $182,048 will be necessary to award the construction contract. Staff recommends that the $96,048 in guaranteed TDA allocation go toward this shortfall. In addition staff recommends that an additional $86,000 advance be requested from future year allocations in order to completely fund the project. 

Staff recommends that the BPAC support the staff recommendation for allocation of the TDA grant funding.

                                         

Information Only Items

 

1.     Approved February 17, 2005 Meeting Minutes

Attached (Attachment 3).

 

2.     BPAC Active Items Report

Attached (Attachment 4).

 

3.     BPAC Email 

Attached (Attachment 5).