| October 21, 2003 |
| SUBJECT:
|
Award of Bid No. F0308-11 for Baylands Park and Duane Avenue Water Main Replacement Project |
| REPORT IN BRIEF |
|
Approval is requested for the award of a contract to Trinet Construction, Inc., of San Francisco for the Baylands Park and Duane Avenue Water Main Replacement Project for the Department of Public Works Project Administration Division (Project #UW-02/01-03). |
| BACKGROUND
|
|
The Baylands Park and Duane Avenue Water Main Replacement Project includes two Infrastructure Projects budgeted in FY 2002-03. At Baylands Park, frequent repairs to the existing main have been necessary due to corrosion caused by acidic soils. This project will replace 3,300 linear feet of existing 8" ductile iron pipe with 8" high-density polyethylene (HDPE) pipe. At Duane Avenue between Fair Oaks and Worley, the existing 6" water main is corroded and lacks sufficient capacity for current fire flow requirements. The project will replace 750 linear feet of existing 6" cast iron pipe with 8" corrosion resistant pipe. |
| EXISTING POLICY |
| None. |
| DISCUSSION |
Bid specifications were prepared by Public Works and Purchasing staff. The Notice Inviting Bids was published in The Sun on September 3, 2003. The bid package was distributed to Bay Area Builders Exchanges and broadcast to potential contractors through the DemandStar by Onvia procurement network. Sixteen contractors requested bid documents.
Sealed bids were publicly opened on September 24, 2003. Seven responsive bids were received.
|
Bidders |
Total Bid |
|
Engineer's Estimate |
$350,000 |
|
Trinet Construction, Inc., of San Francisco |
$325,050 |
|
Avoca Trucking & Excavating, Inc., of San Francisco |
$356,350 |
|
Northwest Construction of Burlingame |
$362,900 |
|
D&D Pipelines of San Francisco |
$382,550 |
|
Stoloski & Gonzalez, Inc., of Half Moon Bay |
$419,650 |
|
West Valley Construction Company, Inc., of San Jose |
$572,750 |
|
Pacific Underground Construction, Inc., of San Jose |
$635,450 |
|
Staff recommends acceptance of the bid from Trinet Construction, Inc., the lowest responsive and responsible bidder.
A determination was made that this project will have no significant effect on the environment in accordance with CEQA guidelines for categorically exempt projects. | |
| FISCAL IMPACT |
|
Projects costs include:
|
Construction |
$325,050 |
|
Contingency (15% of construction costs) |
48,758 |
|
Total cost |
$373,808 |
|
Funds for this project will be available in Public Works Infrastructure Projects #823740 (Baylands Park) and #822840 (Duane Avenue), upon completion of the project budget carryover process. | |
| PUBLIC CONTACT |
|
None. |
| ALTERNATIVES |
|
None. |
| RECOMMENDATION
|
|
It is recommended that Council:
1.
Award a contract in substantially the same form as the attached draft and in the amount of $325,050, to Trinet Construction, Inc., for the Baylands Park and Duane Avenue Water Main Replacement Project; and
2.
Approve a contingency in the amount of $48,758.
|
Prepared by:
Elaine Wesely
Purchasing Officer
Reviewed by:
Mary J. Bradley
Director, Finance
Reviewed by:
Marvin Rose
Director, Public Works
Approved by:
Robert S. LaSala
City Manager |
| ATTACHMENTS
|
| A. Draft General Construction Contract |
|
|
|