The Draft EIR is separated into different parts due to the size of the document:
1. Chapter 1 - Table of Contents, Preface, Summary & Description of Project - text only (2.6MB)
Figures 1-9 (1.3MB)
2. Chapter 2 - Environmental Setting, Impacts and Mitigation
Sections 2.1 - 2.5- text only (3.4MB)
Sections 2.6 - 2.8 - text only (2.6MB)
Sections 2.9 - 2.12 - text only(1.5MB)
Figures 10 - 14 (222kb)
Figure 15 (3.8MB)
Photos 1 & 2 (3.4MB)
Photos 3 & 4 (3.4MB)
Photos 5 & 6 (3.1MB)
Photos 7 & 8 (2.8MB)
Photos 9 & 10 (3.5MB)
Photos 11 & 12 (3.5MB)
Photos 13 & 14 (3.3MB)
Photos 15 & 16 (312kb)
3. Chapters 3-9- text & figures (2MB)
3. Availability of Public Services
4. Growth-Inducing Impacts
5. Cumulative Impacts
6. Significant, Unavoidable Impacts
7. Alternatives to the Project
8. References
9. Authors and Consultants
4. Appendices
Appendix A - Notice of Preparation & Public Response Letters - text only (979kb)
Figures 1-2 (88kb)
Figures 3-4 (3.9MB)
Appendix B - Geotechnical Feasibility Study (1.1MB)
Appendix C - Hydrology and Flooding (1.5MB)
Appendix D - Tree Survey (1.7MB)
Appendix E - Hazardous Materials Reports (3MB)
Appendix F - Transportation Analysis (3MB)
Appendix G - Air Quality Analysis (755kb)
Appendix H - Noise Analysis (1.1MB)
Appendix I - Water Service System (1.2MB)
Appendix J - SB 610 Water Supply Assessment (2.2MB)
Appendix K - Sanitary Sewer System Analysis
K.1 - Project Data Output Sheets (2.8MB)
K.2 - Sanitary Sewer Flow Monitoring (1.79MB)